Completed Projects
Highlighting our services in civil engineering, construction, and underground utility mapping
Installation of Underground TNB Power Cable 11kV from PMU 132kV / 11kV Tuanku Jaafar Industrial Development (TJID) to Linde Malaysia Factory, Lot 32487, Industrial Area Tuanku Jaafar. - Open Cut Method
Installation of 10 inch Nitrogen Gas Pipe from Linde Malaysia Factory to TF AMD Microelectronics at Taman Perindustrian Batu Kawan, Seberang Perai Selatan, Pulau Pinang. - Horizontal Directional Method (HDD)
Civil Works (2.5km) using Horizontal Directional Drilling (HDD) & Fiber Pulling for DIGI 4798A- Kawasan Perindustrian Kulim (KEBWK) - Horizontal Directional Method (HDD)
Fiber Optic Cable Installation Works C&F Spur-SDU RDF Eco Horizon Ashton at Batu Kawan for TT dotCom Sdn. Bhd. - Fiber Pulling
Installation of Fiber Optic Cables, Commercial Install FOC 24C UG (CNC Lite) at Kg. Aman, Kepala Batas, Pulau Pinang for Telekom Malaysia Berhad. - Fiber Pulling
Civil and Fiber Pulling Works of Fiber Optic Cables at Tabung Haji_2020 FTK Cluster (Northern Island), Bayan Lepas (DQ0TP). -Microtrenching Method
Overhead Fiber Optic Cables Installation for 5G Project H5G TGR_F9/F10 CSR DPSPU0301 for SMK Kg Selamat, Tasek Gelugor, Seberang Perai Utara. Fiber Pulling
Utility Detection Mapping Works for New Infra - TNB Power Cable Pipes to Lot 5374 (IOI Acidchem Sdn Bhd at Lorong Perusahaan Satu, Perai, Penang.
Utility Detection Mapping Works for New Infra - Replacing the Defective Existing KVT XLPE and Change the Existing Underground Pathway Pipe From LLM area between PE SMK Seberang Jaya No.2 to PE Desa Sri Jaya, Seberang Perai Tengah, Pulau Pinang.